Cape Coastal Property Group · Sea Point Block B
AS-2026-511
AsbestosAwaiting Laboratory ResultsUrgent
Workflow Position
Quotation Requested
Quotation Drafting
Quotation Issued
Awaiting Client Acceptance
Accepted / Awaiting PO
Project Open
Survey Scheduled
Fieldwork in Progress
Fieldwork Completed
Awaiting Laboratory Results
Report Drafting
Surveyor Review
Technical Review
Corrections Required
Approved
Report Issued
Ready for Invoice
Invoiced
Completed
Commercial
Site
Sea Point Block B
Contact
Yusuf Adams · yusuf@ccpg.co.za
Quotation
QT-2026-0461 (R 91 500)
Purchase order
Not supplied
Signed acceptance
03 Sept 2026
Operational
Disciplines
Asbestos Air Monitoring, Clearance Certificate
Assigned surveyor
Pieter Botha
Team
Pieter Botha
Survey date
11 Sept 2026
Report due
17 Sept 2026
Travel
Day trip — Sea Point
Days open
11 days
Technical
Field forms allocated
2 forms
Entries captured
23 measurements / observations
Samples
1 sample(s)
Equipment allocated
SKC-2210
Next reassessment
Not applicable
Information Reused — Captured Once
Client: Cape Coastal Property GroupSite: Sea Point Block BProject: AS-2026-511Surveyor: Pieter BothaSurvey date: 11 Sept 2026Quotation: QT-2026-0461