Cape Coastal Property Group · Sea Point Block B
AS-2026-505
AsbestosFieldwork in ProgressUrgent
Workflow Position
Quotation Requested
Quotation Drafting
Quotation Issued
Awaiting Client Acceptance
Accepted / Awaiting PO
Project Open
Survey Scheduled
Fieldwork in Progress
Fieldwork Completed
Awaiting Laboratory Results
Report Drafting
Surveyor Review
Technical Review
Corrections Required
Approved
Report Issued
Ready for Invoice
Invoiced
Completed
Commercial
Site
Sea Point Block B
Contact
Yusuf Adams · yusuf@ccpg.co.za
Quotation
Direct instruction
Purchase order
Not supplied
Signed acceptance
—
Operational
Disciplines
Demolition Monitoring
Assigned surveyor
Pieter Botha
Team
Pieter Botha
Survey date
14 Sept 2026
Report due
20 Sept 2026
Travel
Day trip — Sea Point
Days open
5 days
Technical
Field forms allocated
1 forms
Entries captured
5 measurements / observations
Samples
1 sample(s)
Equipment allocated
SKC-2218
Next reassessment
Not applicable
Information Reused — Captured Once
Client: Cape Coastal Property GroupSite: Sea Point Block BProject: AS-2026-505Surveyor: Pieter BothaSurvey date: 14 Sept 2026Scope: direct instruction