KF
Project Register

Cape Coastal Property Group · Sea Point Block B

AS-2026-505

AsbestosFieldwork in ProgressUrgent

Workflow Position

Quotation Requested
Quotation Drafting
Quotation Issued
Awaiting Client Acceptance
Accepted / Awaiting PO
Project Open
Survey Scheduled
Fieldwork in Progress
Fieldwork Completed
Awaiting Laboratory Results
Report Drafting
Surveyor Review
Technical Review
Corrections Required
Approved
Report Issued
Ready for Invoice
Invoiced
Completed

Commercial

Site

Sea Point Block B

Contact

Yusuf Adams · yusuf@ccpg.co.za

Quotation

Direct instruction

Purchase order

Not supplied

Signed acceptance

Operational

Disciplines

Demolition Monitoring

Assigned surveyor

Pieter Botha

Team

Pieter Botha

Survey date

14 Sept 2026

Report due

20 Sept 2026

Travel

Day trip — Sea Point

Days open

5 days

Technical

Field forms allocated

1 forms

Entries captured

5 measurements / observations

Samples

1 sample(s)

Equipment allocated

SKC-2218

Next reassessment

Not applicable

Information Reused — Captured Once

Client: Cape Coastal Property GroupSite: Sea Point Block BProject: AS-2026-505Surveyor: Pieter BothaSurvey date: 14 Sept 2026Scope: direct instruction