Asbestos Clearance Certificate
Project Information
Project No.AS-2026-511Date of clearance28th of April 2026
RAC appointed for projectRegistered Asbestos Contractor
RAC contact personSite SupervisorContact No.—
Name of Principal ContractorCape Coastal Property Group
PC contact personProject ManagerContact No.—
Name of premises / asbestos client for whom clearance is required:Cape Coastal Property Group — Sea Point Block B
Physical Address:112 Beach Rd, Sea Point, Cape Town
Names of buildings from which asbestos containing materials were removed:Main Building and Pool House
Areas / rooms which were not accessible during the visual clearance inspection and therefore excluded from this report:N/A
Nature of asbestos work performed prior to clearance:The removal of asbestos containing roof slate tiles from the above-mentioned areas
Step 1 - Visual Clearance Inspection
Name of person who accompanied surveyorSite Supervisor
Employer of person aboveCape Coastal Property GroupContact No.—
Roof space inspectedYesNoN/AComplete site inspectedYes No
RAC equipment removedYesNoAsbestos waste removed from siteYesNo
All Asbestos as per the Approved Asbestos Plan of Work removedYesNo
Reasons for NO’s above:It should be noted that the waste skip was stored on site at the time of the survey, to be removed at a later date.
Names of buildings / areas which could not be inspected:N/A
Clearance inspection passed√Clearance inspection failed
Reason why clearance was granted:N/A

©The Safety Network (Africa) (Pty) Ltd

Only valid at time of print

SafeNet AfricaDocument NumberSURVSNA AS 06.1 ASBESTOS CLEARANCE CERTIFICATE FORM. ELECTRONICPage NumberPage 2 of 4RevisionsRevision 9Approval date17/11/2025

If failed provide reasons: N/A

Corrective actions needed: N/A

Photos 1 & 2 – These photos show the cleaned gutters and roof area of the Pool House.

Asbestos clearance inspectionAsbestos clearance inspection

Photos 3 & 4 – These photos show the cleaned roof area of the Pool House.

Asbestos clearance inspectionAsbestos clearance inspection

Photos 5 & 6 – These photos show the cleaned gutters observed at the Main House.

Asbestos clearance inspectionAsbestos clearance inspection

Photos 7 & 8 – These photos show the cleaned roof space of the Main House.

Asbestos clearance inspectionAsbestos clearance inspection

©The Safety Network (Africa) (Pty) Ltd

Only valid at time of print

SafeNet AfricaDocument NumberSURVSNA AS 06.1 ASBESTOS CLEARANCE CERTIFICATE FORM. ELECTRONICPage NumberPage 3 of 4RevisionsRevision 9Approval date17/11/2025

Photos 9 & 10 – These photos show the cleaned roof space of the Main House.

Asbestos clearance inspectionAsbestos clearance inspection

Photos 11 & 12 – These photos show the general exterior area of the Main House.

Asbestos clearance inspectionAsbestos clearance inspection
Step 2 - Clearance / Background Monitoring
Type of monitoring conductedClearanceBackgroundNone√
Reason/s why no air monitoring was conducted: No additional air monitoring was deemed necessary as the building was partially demolished after completion of asbestos work. Additional monitoring would require monitoring in open air where asbestos fibre concentrations below the prescribed clearance indicator could be expected.
ND = No fibres detected / BDL = Below Prescribed Limit / <0,01 f/ml = Clearance indicator
Asbestos Clearance CertificateGranted√Not granted
Reason why final clearance was granted: No additional air monitoring was deemed necessary as the building was partially demolished after completion of asbestos work. Additional monitoring would require monitoring in open air where asbestos fibre concentrations below the prescribed clearance indicator could be expected.
Reasons for clearance not being obtained: N/A
Corrective actions needed as to obtain clearance: N/A

©The Safety Network (Africa) (Pty) Ltd

Only valid at time of print

SafeNet AfricaDocument NumberSURVSNA AS 06.1 ASBESTOS CLEARANCE CERTIFICATE FORM. ELECTRONICPage NumberPage 4 of 4RevisionsRevision 9Approval date17/11/2025

Site plan indicating monitoring points established

Pool House
Pool
Main House
Areas where asbestos work
was previously performed
Signatures (Surveyor And Technical Signatory)
I confirm that the information given in this document is accurate, true and complete.Name of SurveyorDesignation
Dylan PrangeRegistered Occupational
Hygiene Technologist
Signature of SurveyorSurveyor signatureDate30th of April 2026
Technical SignatoryTechnical signatory signatureDate30th of April 2026