Occupational Hygiene Monitoring Survey Report
Heat Stress Survey Report
Highveld Mining Services · Witbank Workshop
18 Sept 2026
Project Number OH-2026-140 · Revision 0
Survey Information Details
| Report Number | OH-2026-140-R0 |
| Project Number | OH-2026-140 |
| Client | Highveld Mining Services |
| Site / Premises | Witbank Workshop |
| Physical Address | Erf 1123, Ferrobank, Witbank |
| Survey Date | 18 Sept 2026 |
| Stress Factor | Heat Stress |
| Surveyor | Nomsa Dlamini |
| Technical Signatory | Riaan de Villiers |
| Applicable Legislation | Physical Agents Regulations, 2024 · Environmental Regulations For Workplaces, 1987 |
| Occupational Exposure Limit | WBGT TWA-OEL Per Work Rate And Acclimatisation State |
1.0 Executive Summary
Highveld Mining Services contracted The Safety Network (Africa) (Pty) Ltd to conduct a heat stress survey at Witbank Workshop, Erf 1123, Ferrobank, Witbank. The survey was conducted on 18 Sept 2026 by Nomsa Dlamini.
Two positions exceeded the applicable WBGT TWA-OEL for the work rate performed.
2.0 Purpose Of The Survey
- Measure the wet bulb globe temperature index at representative work positions
- Determine the metabolic work rate of employees at each position
- Compare exposures with the heat stress TWA-OEL
- Recommend heat stress control and management measures
3.0 Contents Of Report
- 1.0Executive Summary
- 2.0Table Of Contents
- 3.0List Of Tables, Figures And Diagrams
- 4.0List Of Terms And Abbreviations
- 5.0Introduction
- 6.0Monitoring Methods And Procedure Followed
- 7.0Results And Discussion
- 8.0Recommendations
- 9.0Conclusion
- 10.0Indemnity And Signatures
- 11.0References
- 12.0Annexures To The Report
4.0 Instruments Used
| Instrument | Serial Number | Calibration Due |
|---|---|---|
| Gilian 5000 pump | GIL-4402 | 04 Nov 2026 |
| Gilian 5000 pump | GIL-4407 | 22 Oct 2026 |
| SKC Airchek TOUCH | SKC-2210 | 27 Sept 2026 |
5.0 Results And Discussion
| Position | Area | Work Rate | WBGT °C | TWA-OEL °C | OEL Exceeded |
|---|---|---|---|---|---|
| H-01 | Boiler House | Moderate | 29.4 | 28.0 | Yes |
| H-02 | Packing Line | Light | 26.1 | 30.0 | No |
| H-03 | Outdoor Yard | Heavy | 27.8 | 26.0 | Yes |
Two positions exceeded the applicable WBGT TWA-OEL for the work rate performed.
6.0 Recommendations
- Implement a work-rest regime at the boiler house and outdoor yard
- Provide cool potable water and shaded rest areas
- Include exposed employees in heat stress medical surveillance
- Re-survey during the hottest month of the year
7.0 Conclusion
Heat stress requires active management at two positions through work-rest scheduling and hydration control.
8.0 Annexures To The Report
- Annexure A — Certificate Of Approval As A Department Of Employment And Labour Approved Inspection Authority
- Annexure B — SAIOH Certificates Of Surveyor And Technical Signatory
- Annexure C — Equipment Calibration Certificates
- Annexure D — Raw Measurement Data
- Annexure E — Photo Log
- Annexure F — Site And Floor Plans
The Safety Network (Africa) (Pty) Ltd
T/A SafeNet Africa
Dept. of Employment and Labour: AIA OH 0242 CI062
Signature of Technical Signatory
Riaan de Villiers
Signature of Surveyor
Nomsa Dlamini